Natural and wastewater treatment
Since 1989
professional solutions
for natural and waste
water treatment

Metalworking and chemical industry

Общие данные

Metalworking and chemical industry

Application of the technology implemented in the UKOS-PROM installation in the course of upgrading and reconstructing the existing treatment facilities, as well as in the constructing new neutralization stations, enables one to:

  • carry out sewage treatment of galvanic production with medium and high concentrations of heavy metal ions up to the required standards with separation or without separation of wastewater into categories;
  • partially abandon the use of chemical reagents or significantly reduce their consumption;
  • disinfect and stabilize purified water;
  • reduce the amount of reagents used, to lower salt content of purified water;
  • lower the amount of solid waste, which in composition, physicochemical and mechanical properties are suitable for further processing and disposal;
  • depending on the salt content of waste water entering treatment, reuse 50-90% of purified water in galvanic production without the need for additional equipment for its desalting;
  • Deploy water treatment equipment in a compact way, reduce the length of process pipelines, the number of pumps and fittings;
  • Reduce the material consumption and energy intensity of the process of wastewater treatment and processing of generated solid waste by 15-25%.

In its efficiency, technical and economic indicators the UKOS-PROM water treatment complex corresponds to the current world level.

Technical solutions used in technology and equipment are patented, and elements of "know-how" are provided for in them.

Application range

The UKOS-PROM block-modular water treatment complex is designed for cleaning the following categories of waste water:

  • production of printed circuit boards
  • effluents of galvanic production
  • effluents of metallurgical productions
  • circulating water from hydrofilters of painting chambers
  • leather production
  • chemical-pharmaceutical production
  • drainage water from landfills
  • circulating cooling water
  • oil and oil-containing effluents
  • paint and varnish production
  • other categories of industrial effluent when installing additional modules

Комплект поставки

В основной комплект поставки входят:

  • the UKOS-PROM water treatment complex
  • electrolyzers with plate electrodes or chip mixers
  • saturators and ejectors
  • nutch filter or filter press
  • containers for expendable reagents
  • components and equipment, pipes, fittings, fixtures (as agreed with the Buyer)

Исполнение

The equipment is manufactured of carbon steel, plastic or stainless steel.

Условия поставки

Срок поставки: 1-3 месяца (в зависимости от типоразмера оборудования, загруженности производства, сроков поставки комплектующих).

Транспортировка: by any transportation means available.

Складирование оборудования: under canopy, or in the open during summer season.

Гарантия

Стандартный гарантийный срок составляет 12 месяцев со дня приёмки оборудования в эксплуатацию. Возможно увеличение срока гарантии за дополнительную плату.

Исходные требования

Установку допускается применять при следующих исходных данных:

  • drainage flow rate, m3/h - up to 100
  • Concentration, maximum, mg/l:
    • heavy metals (amount) - 1000
    • Extractables - 250
      • including petroleum products - 200
  • drainage temperature, °C - 10-50

Technical specifications

# Indicator Complex modification
         
1. Capacity, m3/hr 1 1-2.5 2.5-5 5-10 10-25
2. Operation time to electrodes change, months 6-12
3. Contaminants concentration in purified water, mg/l:
- chromium hexavalent absent
- chromium trivalent traces
- ferrum, total traces
- zinc traces
- nickel traces
- copper traces
- petroleum products 0.05
- suspended matter 2.0
- COD mg О2/l as required by the customer
- рН 6.5-8.5
4. Outer dimensions, mm:
- Length (L) 2 500 3 300 4 000 6 500 7 500
- Width (W) 1 200 2 000 2 000 2 500 2 500
- Height (H) 2 500 2 500 2 500 2 500 5 000
5. Installed power, kW, max 5 8 12 25 60
6. Filtering cycle duration, hr 10
7. Operation mode continuous or periodic

Note: upon request, a UKOS-PROM water treatment plant with a capacity exceeding 100 m3/h may be supplied